About Mr Phil Penn
Dear Sir
I have started a contract with a Chinese lady to build an extension and loft conversion and refurbish the property.
She is the Client and also the Architect/contract administrator, during the works she hasn't got a clue she is 29 and a sales lady, things are going wrong she has employed her own contractors which the contract said she can, but I am the main contractor and she signed a document agreeing I have the final say in all matters, to her I don't think so.
we signed the Domestic Building Contract 2014. I found Asbestos in one of the rooms after the painter removed the wallpaper round the fire place, I asked everyone to vacate the premises until it is analysed, the client served notice on me for Abandonment and breach of contract for walking of the site. I tried to explain but she wont have it. She demanded all her own people go back or they wont get paid, she opend up the site and allowed then back in.
She removed the WC, removed the warning notice sign out the front, and allowed a plasterer to smoke in the premises.
Can she be the Client and contract administrator.
Your help in ansering my enquiry would be appreciated
Regards
Phil Penn.
Featured articles and news
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.